Post document package reviewer
City : Windsor
Category : See posting on Fluor site
Industry : Engineering
Employer : Fluor Canada
Bridging North America (BNA), a partnership of Fluor, ACS Infrastructure Canada and Aecon Group Inc., is seeking candidates for the Gordie Howe International Bridge project.
BNA was selected to design, build, finance, operate and maintain the CAD$5.7 billion (approximate US$4.4 billion) Gordie Howe International Bridge project for Windsor-Detroit Bridge Authority (WDBA).
When completed, the bridge will be the longest cable-stayed bridge in North America. The project includes a bridge and border crossing spanning the Detroit River and connecting Detroit, Michigan, U.S., and Windsor, Ontario, Canada, by linking Interstate 75 and Interstate 96 in Michigan with the new extension of Highway 401 (Rt. Hon. Herb Gray Parkway) in Ontario. The scope also includes building new, state-of-the-art ports of entry on both the U.S. and Canadian sides of the Detroit River as well as improvements to existing infrastructure in both Michigan and Ontario.
This is an entry-level position designed to develop knowledge and abilities about supplier quality surveillance. The purpose of this position is to work on routine assigned tasks which are tactical and administrative in nature by assisting and supporting the Quality specialists and engineers.
Responsibilities/Scope of Work:
• Responsible for Project Wide Quality Package Handover submissions
• Responsible to building and reviewing construction quality documents packages
• Assist with day to day construction quality issues- NCRs, Quality records, Quality logs, Presentations
• Assist as needed with Training preparation and delivery
• Assist with updating of logs and data that is utilized to maintain project wide KPIs
• Audit ITP QR files and folders making sure all files are in Aconex
• Communicate with Handover, Quality and Construction on weekly basis to track status of handover packages.
BNA was selected to design, build, finance, operate and maintain the CAD$5.7 billion (approximate US$4.4 billion) Gordie Howe International Bridge project for Windsor-Detroit Bridge Authority (WDBA).
When completed, the bridge will be the longest cable-stayed bridge in North America. The project includes a bridge and border crossing spanning the Detroit River and connecting Detroit, Michigan, U.S., and Windsor, Ontario, Canada, by linking Interstate 75 and Interstate 96 in Michigan with the new extension of Highway 401 (Rt. Hon. Herb Gray Parkway) in Ontario. The scope also includes building new, state-of-the-art ports of entry on both the U.S. and Canadian sides of the Detroit River as well as improvements to existing infrastructure in both Michigan and Ontario.
This is an entry-level position designed to develop knowledge and abilities about supplier quality surveillance. The purpose of this position is to work on routine assigned tasks which are tactical and administrative in nature by assisting and supporting the Quality specialists and engineers.
Responsibilities/Scope of Work:
• Responsible for Project Wide Quality Package Handover submissions
• Responsible to building and reviewing construction quality documents packages
• Assist with day to day construction quality issues- NCRs, Quality records, Quality logs, Presentations
• Assist as needed with Training preparation and delivery
• Assist with updating of logs and data that is utilized to maintain project wide KPIs
• Audit ITP QR files and folders making sure all files are in Aconex
• Communicate with Handover, Quality and Construction on weekly basis to track status of handover packages.