
Jr Project Coordinator (Infrastructure project)
City : Windsor, Ontario
Category : See posting on Fluor site
Industry : Engineering
Employer : Fluor Canada
Bridging North America (BNA), a partnership of Fluor, ACS Infrastructure Canada and Aecon Group Inc., is seeking candidates for the Gordie Howe International Bridge project.
BNA was selected to design, build, finance, operate and maintain the CAD$5.7 billion (approximate US$4.4 billion) Gordie Howe International Bridge project for Windsor-Detroit Bridge Authority (WDBA). When completed, the bridge will be the longest cable-stayed bridge in North America. The project includes a bridge and border crossing spanning the Detroit River and connecting Detroit, Michigan, U.S., and Windsor, Ontario, Canada, by linking Interstate 75 and Interstate 96 in Michigan with the new extension of Highway 401 (Rt. Hon. Herb Gray Parkway) in Ontario. The scope also includes building new, state-of-the-art ports of entry on both the U.S. and Canadian sides of the Detroit River as well as improvements to existing infrastructure in both Michigan and Ontario.
The Jr Project Coordinator will assist in the coordination of design status, construction phase services (CPS), and contract/commercial items.
Responsibilities/Scope of Work:
- Coordinate communication internally between design coordinators and FREs in relation to CPS schedule and commercial items
- Subcontractor Supervision
- Safety, Quality and Environmental supervision
- Develop SOW, JSA and participate in ITP
- Develop Accruals
- Ensure construction activities move according to predetermined schedules.
- Verify that products are available for trades to pick up
- Monitor the progress of the construction activities on a regular basis
- Ensure that each crew has the tools it needs to meet project milestones
- Create project schedules that include materials estimates and manpower needs to be submitted to management
- Assist in documenting project phases and creating summary reports
- Work with field personnel to handle project issues as they arise
BNA was selected to design, build, finance, operate and maintain the CAD$5.7 billion (approximate US$4.4 billion) Gordie Howe International Bridge project for Windsor-Detroit Bridge Authority (WDBA). When completed, the bridge will be the longest cable-stayed bridge in North America. The project includes a bridge and border crossing spanning the Detroit River and connecting Detroit, Michigan, U.S., and Windsor, Ontario, Canada, by linking Interstate 75 and Interstate 96 in Michigan with the new extension of Highway 401 (Rt. Hon. Herb Gray Parkway) in Ontario. The scope also includes building new, state-of-the-art ports of entry on both the U.S. and Canadian sides of the Detroit River as well as improvements to existing infrastructure in both Michigan and Ontario.
The Jr Project Coordinator will assist in the coordination of design status, construction phase services (CPS), and contract/commercial items.
Responsibilities/Scope of Work:
- Coordinate communication internally between design coordinators and FREs in relation to CPS schedule and commercial items
- Subcontractor Supervision
- Safety, Quality and Environmental supervision
- Develop SOW, JSA and participate in ITP
- Develop Accruals
- Ensure construction activities move according to predetermined schedules.
- Verify that products are available for trades to pick up
- Monitor the progress of the construction activities on a regular basis
- Ensure that each crew has the tools it needs to meet project milestones
- Create project schedules that include materials estimates and manpower needs to be submitted to management
- Assist in documenting project phases and creating summary reports
- Work with field personnel to handle project issues as they arise